Traction Tester Retrofit – Job #1321

2018-07-05T20:36:53+00:00

WIS redesigned and built a Traction Tester for a local company that manufactures load wheels. We started out with an existing machine that was recording data that was above and beyond usable. We reused all the electronics and controls for the system but literally reconfigured the orientation of how the loads were being introduced to the wheel. A

Reconditioning Job #1179

2018-04-23T14:45:39+00:00

Warren Industrial offered to build a turnkey unit ready for installation on our customer’s production floor. The customer supplied the rolling frame, 80/20 guarding, the Dukane Ultrasonic welding assembly and a lid snapper conveyor. We designed, built, and assembled an indexing dial table that would automate this machine and also featured a “pick-and-place” assembly that set